Differences between revisions 2 and 7 (spanning 5 versions)
Revision 2 as of 2008-10-10 15:20:38
Size: 301
Editor: MikeHansen
Comment:
Revision 7 as of 2008-10-10 15:34:33
Size: 709
Editor: DavidHarvey
Comment: typo
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * starting monday daily and optional status report meetings at 6pm in the ampitheatre  * starting monday daily and optional status report meetings at 6pm in the amphitheater
Line 10: Line 10:
== Informal lectures ==

These should be held on Monday

 * Using Cython (Robert Bradshaw)
 * The new coercion system - the final frontier (Robert Bradshaw or any other volunteer)
 * Mercurial and Mercurial Queues (Mike Hansen)

== Coordinators ==

 * Combinatorics: Mike Hansen
 * Linear Algebra: Clement Pernet
 * Groebner Basis (Martin Albrecht)
 * Elliptic Curves (?)
Line 12: Line 27:
 * SageCombinat  * Bug Squashing (Michael Abshoff)

SD 10 Coding Sprint

Rules

  • participation is optional
  • starting monday daily and optional status report meetings at 6pm in the amphitheater
  • each person should only participate in a project or two
  • 3.1.3 should be out by monday

Informal lectures

These should be held on Monday

  • Using Cython (Robert Bradshaw)
  • The new coercion system - the final frontier (Robert Bradshaw or any other volunteer)
  • Mercurial and Mercurial Queues (Mike Hansen)

Coordinators

  • Combinatorics: Mike Hansen
  • Linear Algebra: Clement Pernet
  • Groebner Basis (Martin Albrecht)
  • Elliptic Curves (?)

Suggested projects

  • Bug Squashing (Michael Abshoff)

days10/CodingSprint (last edited 2008-11-14 13:41:50 by anonymous)